Arcadia High School

A PERFECT SOLUTION FOR A COMPLEX TASK

Arcadia High School’s gym renovation was publicly funded from the Los Angeles Union School District.  Upon inspecting the existing 40 year old floor, one could see that the uneven 152 to 178mm sub floor construction really was a challenge for the existing floor.  Additionally, there was a newly added on floor system to the old gym floor with a construction height of only 102mm.  This created the necessity to have two floor systems used beneath one large gym floor area. 

The perfect solution proved to be Junckers 2-layer batten solution DuoBAT 120+ with possible construction height from 120-245mm and Junckers 1-layer batten solution UnoBAT 62+ with possible construction height from 62-214mm.

1800 m² of Junckers solid hardwood SylvaSport Beech Premium were installed in this gym and the fact that the hardwood floor was lacquered from the factory enabled a quick turnaround time, so the school could reopen quickly

Get free sample or quote

Choose the look of the wooden floor:

A healthy choice

Junckers flooring and wood care products
carry the Danish indoor climate label

Indoor climate

Suitable for underfloor heating

Elegant solution with design freedom
No pipes or radiators

More information 

Easy installation

Clip, glue or batten system -
Which solution is right for you?

Installation methods

Try Junckers' CO2 calculator

Find the most environmentally
friendly flooring solution

Calculate your CO2 footprint

Green Credentials

We document the environmental impact of our floors
with EPDs and ISO 14001 + 50001 certification

More information 

Responsible forestry

Junckers floors are made from sustainable wood
and are certified by FSC® and PEFC

Certified wood

 
keyboard_arrow_up



picture_as_pdf