UNOBAT 53 / 68 / 80 BATTEN SPORTS FLOOR
SPECIFIER'S AND INSTALLATION INSTRUCTIONS

D 16.1

 

D 16.1

 


1. SPECIFIER'S INSTRUCTIONS


INFORMATION
UNOBAT 53/68/80 BATTEN SYSTEM

D 1.0

General information
Junckers sports floors

D 16.1

Specifier's - and
Installation Instructions

Table 1

1.1 SYSTEM SPECIFICATION

Junckers Unobat 53 / 68 / 80 sports floor systems are based on 22 mm solid hardwood floorboards fastened to a subfloor system consisting of single layer engineered battens, fitted with a continuous layer of shock absorbing foam.

The systems can be installed on a dry, load-bearing floor of concrete, or on an existing sports floor with a synthetic- or wooden based surface.

Batten distance:
Choose between c/c 336 and 411 mm.  The distance is determined based on needed sports functional characteristics and/or strength.
If the floor is used for basketball or retractable seating are to be installed in the sports hall, c/c 336 mm must always be used.

Construction height: 
The heights of the systems include battens and boards.

Unobat 53: 53 mm.
Unobat 68: 68 mm.
Unobat 80: 80 mm.

Performance:
The floor systems are area elastic sports floors with sports functional characteristics and strength properties related to construction height and batten distance. The systems are tested and classified according to EN 14904.

Unobat 53 (336): EN 14904 – class A4 og FIBA level 1
Unobat 53 (411): EN 14904 – class A4
Unobat 68 (336): EN 14904 – class A4 og FIBA level 1 
Unobat 68 (411): EN 14904 – class A4
Unobat 80 (336 / 411): EN 14904 – class A3

Very suitable for multifunctional sports halls, fitness and squash. 

Read all information:
lease note that full documentation of this floor system comprises General information, Specifier's and Installation instructions, see table 1.

By questions, please contact Junckers Technical Service.

1.2 FLOOR COMPONENTS - UNOBAT 53 / 68 / 80 BATTEN SYSTEM

  1. Junckers 2-strip solid hardwood floor boards for sport
    Thickness x width x length
    22 x 129 x 3700 mm

    Wood Species, grade and surface:
    See data sheet B 2.0

  2. Junckers J-Nails (Machine nail)
    2,2 x 45 mm special developed J-nails with a high shearing- and pull out strength.

  3. Laminated battens
    31 x 45 x 2400 mm
    46 x 45 x 2400 mm
    58 x 45 x 2400 mm
    Including a 10 mm continuous PU-foam.

    Batten distance: 
    c/c 336,4 mm (336)
    c/c 411,1 mm (411)

    Battens are made of spruce with a moisture content of 8-10 %. 

  4. SylvaThene moisture barrier
    0,20 mm PE-foil. 

  5. Expansion gap at the wall
    1.5 mm per metre width on each side and 1 mm per metre length at each end, but both min. 30 mm. Is also required at fixed points, e.g. column.

Fig. 1

1.3 LOAD BEARING STRENGTH

The Sports Floor Systems are designed to ensure good technical properties in relation to the expected loads in connection with sports activities.

Bearing capacity at point loads
The batten systems are tested and approved for below mentioned maximum point loads, in relation to load area and batten centres c/c 411 og 336 mm. For heavily loaded areas such as scenes or stands, it may be necessary to install extra battens. 

Table 2 shows the maximum load-bearing capacity from point loads at the batten system's recommended batten distances and at given loading areas.

Table 2

 

Batten distance c/c 336 mm:

Batten distance c/c 411 mm:

ø 25 mm: 4.5 kN (approx. 450 kg)

ø 25 mm: 4.0 kN (approx. 400 kg)

100x100 mm: 5.5 kN (approx. 550 kg)

100x100 mm: 5.0 kN (approx. 500 kg)

Table 3 shows use of the floor system in relation to the load classes in EN 1991-1-1, corresponding to load bearing requierements and the floor having acceptable stiffness. Furthermore the applicability of the floor system in relation to wheel load is noted.

For further definition of load classes and types, see General Information Junckers sports floors D 1.0 - Stiffness and loadbearing strength.

Table 3

Loading types

Loading category

Area- and Point load

Wheel load

C4: Assembly halls for physical activity, e.g. gyms/theatres

Approved* 

Approved**

C5: Assembly halls which can be crowded, e.g. sports halls incl. stands

Approved* 

Approved**

* Point load area min. 200 x 200 mm  / ** Wheel loads, see D 1.0 - Table 2


Fig. 2

1.4 FLATNESS OF THE SUBFLOOR

Battens must be straight with no distortion and the subfloor must be levelled so that any deviations in the flatness do not conflict with the requirements of the method stated below.

Straight edge:
The subfloor must be flat with a maximum deviation of 2 mm under a 1.5 m straight edge.
(UK: 3 mm under a 2 m straight edge acc. BS 8201).
(US: 3/16” under a 10 ft. straight edge).

Deviations are measured as gaps under the straight edge. The surface must be smooth. Any irregularities must be corrected by grinding or by using a self levelling compound.

Fig. 3

1.5 THE 10-BOARD RULE

In order to minimize stress or gaps in the floor due to fluctuations in the climatic conditions within the building, floor boards must be laid according to a 10‑board rule.

This indicates the measurement across 10 boards when laid and should be checked continuously during the installation and afterwards, see Fig. 3.

To keep the 10-board measurement (10 BM), it is recommended to use spacers during installing of the floor. Spacers are delivered in a range of sizes fitting the expected relative humidity of the room. 

Fig. 4

The 10-board measurement is chosen on the basis of the expected maximum relative humidity in the building when in use throughout the year, see fig. 4

The figure illustrates the 10-board rule in relation to the relative air humidity for 129 mm boards. E.g. an expected relative humidity of max. 65 % RH will normally require a 10- board measurement of approx. 1294 mm.

The outer bords of the 10-board rule, which also depend on the floor size, are marked with dotted lines.

The size of the floor, as well as it’s placing, i.e. ground floor or floor division, may also have influence on the choice of the 10-board measurement.

Please contact Junckers technical service department for advice.


Fig. 5

1.6 THERMAL INSULATION AND PIPES IN THE SUBFLOOR

The batten system provides good opportunity to incorporate thermal insulation.

There must be sufficient ventilation between the underneath of the floor boards and the insulation. This to prevent fungal attacks in the flooring construction.

All central heating, cold and hot‑water pipes under floors must be carefully insulated using at least 20 mm mineral wool or similar.

It must be ensured that there is a sufficient space between underneath of the floor board/batten and the pipe insulation to allow for unimpeded vertical movement of the floor, see Fig. 5.

1.7 MOISTURE PROTECTION

Concrete subfloors
The residual moisture contained in the concrete or screed must not exceed 90 % RH.
(UK: Concrete moisture max. 75 % RH acc. to BS 8201)

At ground level and other upper levels, protection against moisture both from within the building and from the ground is required.

A moisture barrier is established by laying a damp-proof membrane, 0.20 mm PE membrane or 1000 g polythene, e.g. Junckers Moisture Barrier, directly on the concrete before laying out the battens, see Fig. 4 (dotted line).

Wooden subfloors
For renovation projects where new floor systems are laid on existing wooden subfloors, it must be ensured that the entire structure has been designed to the correct specifications regarding moisture.

Usually, no additional moisture protection must be applied on top of the existing sports floor, as this may course the risk of fungal attacks in the subconstruction.


1.8 VENTILATION OF THE SUBFLOOR

In general, batten sports floor systems should be installed using skirtings with ventilation slots, to ensure adequate ventilation of the substructure. Moreover, to minimize the consequences of environmental fluctuations in the building as much as possible, the same climate should be maintained both above and below the floor surface.

The expected relative humidity range will usually be complied with through natural ventilation via the aforementioned ventilation slots. By natural ventilation we mean the air flow will be as a consequence of movement of the floor surface during normal sports activities.

In all circumstances it is important that the ventilation slots at the walls be retained and that the moisture-protection instructions are observed, see Moisture protection.


1.9 NET CONSUMPTION OF MATERIALS

Net consumption:

Floor boards: Area + approx. 2 % wastage

Battens c/c 336: 3.0 rnm per m²
Battens: c/c /411: 2.5 rnm per m²

J-Nails c/c 336: 25 pcs. per m²
J-Nails c/c 411: 20 pcs. per m²

Loose tounges of 600 mm: 1 x the length of the sports hall
Junckers SylvaFix header joint adhesive: 1 bottle per 300 m²
SylvaThene moisture barrier, 0,20 mm PE-foil: Area + approx. 10 % wastage


2. INSTALLATION INSTRUCTIONS


WHEN TO START INSTALLATION

The building must be weather tight. The heating system must be installed and tested, and during the heating season there should be a constant heat supply.

Cast concrete elements, including casting of sockets for fixtures and fittings, screeding and other wet trades which can contribute moisture to the building, e.g. priming of paintwork, must also be completed.

The relative humidity in the building must be between 35-65 % RH (UK) and the temperature approx. 16-20 °C.

The residual moisture contained in the concrete or screed must not exceed 90 % RH. (UK: 75 % acc. To BS 8201).
In wooden based sub floors the moisture content should not exceed 12 %.

Solid floor boards should always be laid immediately after arrival at the building. The wrappring of the floor boards must not be removed until just prior to laying the floor, i.e. no acclimatising of the boards on site must take place.


2.1 MOISTURE BARRIER

On concrete sub floors a moisture barrier of min. 0.20 mm PE membrane is laid, e.g. Junckers SylvaThene moisture barrier.

The moisture barrier is laid with an overlap of 200 mm at all joints, continuing up walls, etc.

The polythene has to be taped at all lap joints.


2.2 EXPANSION GAPS AT WALLS AND FIXED OBJECTS

The minimum expansion gap at walls and fixed objects must be 30 mm in order to allow for movement of the floor, but also to provide for ventilation of the substructure. In the case of especially wide spans it may be necessary for a gap of more than 30 mm to be formed.

This is calculated at 1.5 mm per m width at each side and 1mm per m length at each end of the floor.

For floors less than 10 m wide the minimum expansion gap size can be reduced to 15 mm.

The gap between wall and floor is covered with Junckers combi sports skirting.

2.3 SUBCONSTRUCTION - BATTEN CENTRES 411 MM

The battens are laid parallel to the shortest side of the room to ensure that the boards are laid parallel to the longest side of the room.

The first and last rows of battens are laid with a distance of 100 mm from the wall to the centre of the batten. The second batten row is centred at 341 mm to the first batten row.

All other batten rows are centred at 411.1 mm by using the Spacing Battens (A).

Batten end joints should not be in line, but must be staggered min. 600 mm from the neighbouring row. 

Squash:
If the floor is used as a squash court permanent spacing blocks at 500 mm centres are attached between the first batten row and the end wall where the play is performed. 


2.4 SUBCONSTRUCTION - BATTEN CENTRES 336 MM

Except for the batten distance, the battens are laid according to the instructions in part 3 (above).

The first and last rows of battens are laid with a distance of 100 mm from the wall to the centre of the batten.

The second batten row is centred at 266 mm to the first batten row.

All other batten rows are centred at 336.4 mm by using the Spacing Battens (A).


2.5 BATTENS AT NET POSTS, PIPES ETC.

Place extra loose battens at net posts, pipes, etc. Loose battens must be elastic.

Distance to all walls, net posts, pipes, etc. see section 2.2.

2.6 LAYING OF FLOOR BOARDS

If the floor is more than 12 m wide the installation must begin in the middle of the sports hall. Use one of the following two methods:

  1. The two centre floorboards are joined with a loose tongue which must be glued to one of the floorboards in the full length of the floorboard.
  2. Use Junckers CenterRow boards. These floorboards are constructed with a tongue on both sides.

The floorboards must be laid in a continuous pattern with well-defined distribution of board header joints from row to row of 2 x the batten centres, i.e. 822.2 mm with c/c 411.1 mm, or 4 x the batten centres, i.e. 1345.6 mm with c/c 336.4 mm. In that way that all board headerjoints are supported. The floorboards are secretly nailed, see section 2.9.


2.7 DISTANCE, BOARD HEADER JOINTS - C/C 411 MM

All board header joints must be fully supported and, depending on the batten centres (336 or 411 mm) all boards must be laid in the pattern shown in the drawing.

If the batten centres is 411.1 mm, the distance between board header joints in two consecutive rows must be 2 x 411.1 mm = 822.2 mm, as shown in the drawing.


2.8 DISTANCE, BOARD HEADER JOINTS - C/C 336 MM

If the batten centres is 336.4 mm, the distance between board header joints in two consecutive rows must be 4 x 336.4 mm = 1345.6 mm, as shown in the drawing.

2.9 NAILING

Use Junckers machine J-Nails, 2.2 x 45 mm. The floor boards are secretly nailed at an angle of 45°. Do not nail closer than 50 mm to stave joints and never in the board end joints.

To avoid creaking, the floor boards are pressed down on the battens while they are nailed.

The distance between the floor boards and walls/vertical fixed installations is calculated as 1.5 mm per running metre of floor width on each side, and at end walls 1 mm per running metre of floor length, with an overall distance of minimum 30 mm.

The first and last rows of floor boards installed must be face nailed or screwed and then covered with matching filler.

REMEMBER DURING THE INSTALLATION TO WATCH THE FIXED 10-BOARD MEASUREMENT.


2.10 BUSHINGS

On mounting of bushings in the surface of the floor the internal diameter of the bushing must exceed that of the pipe, i.e. the external diameter of the net pole, by at least 40 mm.

At the outermost zones of the floor all bushings are mounted eccentrically towards the middle of the floor in relation to the sockets in the concrete.

NB: Floor rosettes must be mounted to allow both vertical and horizontal movement of the floor to take place unimpeded.


2.11 COMBI SPORTS SKIRTING

Junckers Combi Sports skirting can depending on the wanted cover width be mounted upright or in a lying position, see figure.

The foot of the skirting must lie flat and be in contact with the floor. End joints may be either butt jointed together or cut as a 45° mitre joint to enhance the visual effect of the joint.

The skirting can be either glue fixed to the walls or screw fixed.

Do not fix the skirting to the floor and ensure that the skirting is not exerting any downward pressure on the floor.